I. Mensura et Palgaith
Stricte sequi signa in constructione drawings pro positioning secundum propernendum puncta et reference elevationes tradidit per inspectionem Supervisory Engine, utor gradu ad inspectionem.
II. Foundation pit excavation
Fundamentum foveam excavatum stricto secundum elevationem et geometricae dimensiones requiritur per consilium et basis purgari et connectatur post excavationem.
III. Foundation effundens
(I) Stricte sequitur quod materia specifications certa in consilio drawings et binding modum certa in technica cubits, portare de binding et installation of the basic ferro, et cognoscere et in habitans in Steel Engineer.
(II) et fundamenta embedded partes sit calidum, intinge galvanized.
(III) Concretum effuso debet esse plene Suscitavit aequaliter secundum materiam proportionem, infudit in locis horizontali, et crassitudo vibratory tamping oportet non excedant 45cm ne separationem inter duo layers.
(4) The concrete is poured twice, the first pouring is about 20cm above the anchor plate, after the concrete is initially solidified, the scum is removed, and the embedded bolts are accurately corrected, then the remaining part of the concrete is poured to ensure the foundation The horizontal error of the flange installation is not more than 1%.